Client type /
Fabless silicon scale-up · US
Challenge /
Could not close a verification team fast enough to hold a tape-out window.
Talent architecture /
Embedded a senior DV lead, then built a structured IC layer beneath them.
Roles involved /
- DV Lead
- Formal / UVM
- DFT
Risk reduced /
A verification gap that threatened the tape-out schedule.
